Shower is installed (fastened and drain connected). It was not much fun to move it in and out 3 times to position the trap assembly in the exact location for gluing.
Washer and pump drain and vent lines. I wish I would have done this myself since it was hard to get the plumber to do what I wanted and I still had to rework some things.Pump outlet to sewer has cleanout behind toilet.Backfilled...I forgot to get a picture of the big dirt pile.
6" clay sewer line. Plumber's helper had to live down in the bottom of the 4' trench for a while. This took them about 4 hours to complete and were handsomely rewarded.
New PVC Y fitting to 3" ABS line to house.
No comments:
Post a Comment