SMA SunnyPortal Solar generation report
New EKM power meter will also soon connect to water meter and gas meter.
Hourly History
Tuesday, November 13, 2018
Sunday, September 02, 2018
DIY Solar PV Electric System
After having salvaged an old solar PV system from a house that was getting demolished two years go and putting the panels on last summer to see what they were capable of doing, I decided to go all in and build a new system on our house. The old system was 13 years old and 3x less efficient and outdated than what could be purchased now. The urgency was due to the ending of the subsidies and tax breaks. They will all be disappearing over the next few years including the 30% tax refund on installation cost. Now was the time to do it. I got a bid for a company to do the job and it was $18,000 - 30% ( which would never pay for itself with our annual use of $300 of electricity. I estimated about $7500 in materials and fees and then you subtract 30% so that worked out to $5200 in the end before generation credits. I would take on the job to see if I could pay myself $7500 for about a month of part-time work.
Photos are backwards of course.
One by one, every nice night after work I would pull up another panel or two.
I would hand carry each panel up to the roof myself up the scaffolding. I borrowed my dad's roof fall arrest harness for safety.
Photos are backwards of course.
First kWh generated September 1st after waiting nearly a month for the electric utility to install the meter.
One by one, every nice night after work I would pull up another panel or two.
Installing the racking was straightforward of course it took a few tries to figure out what straight meant since the roof has is not flat or square in any direction. Some setscrew clamps were used to attach the rails to the roof standing seams. This was another reason I decided I could handle this as a DIY project.
I would hand carry each panel up to the roof myself up the scaffolding. I borrowed my dad's roof fall arrest harness for safety.
SMA Sunny Boy inverter and rapid shutdown from Germany looked like top quality assembly and construction on the inside.
Friday, March 01, 2013
Bathroom Finally Finished
Here are some images of the finished bathroom. Final finishing always takes too long.

Glass pocket door
Glass pocket door
Saturday, October 20, 2012
Steps Update
We had temporary basement steps for years and it was finally time to finish them. Wanted clear Douglas fir to match the rest of the house and it ened up costing $50 per step. Good thing there were only five.
Super tricky secret drawers in three of the risers.
Applied full trim boards on outside of stringers to avoid scribing, but made each tread need to be custom fit to the 1/32" with 2 degree off perpendicular cross cuts.
Raya helped with the screws
Thursday, September 20, 2012
Cork Floor
I finally finished the baseboards after the floating cork floor went in.

It feels a little hollow under foot, but is very comfortable considering it is directly over concrete.


It feels a little hollow under foot, but is very comfortable considering it is directly over concrete.
Subscribe to:
Posts (Atom)