Finally Drywall...
It is a big step to get to drywall. Endless guessing on fixture and wire locations have been eating up a lot of time. No more thinking about it now since it is all covered up. I did leave access in the closet ceilings and along the center beam to get to almost any joist bay if I need to run additional wires in the future. A single guy was hanging 12' sheets with his handy lift...of course he still had to lift the 82# sheets onto the machine. The drywall deliverers seemed to have no trouble carrying the double sheets down into the basement. I guess you get used to carrying 82# all day. Of course it did shrink the space, but it made it a lot brighter (on this sunny day) so it overall is fine for a low ceiling (7') basement.